Hello
There is one lot for 10 qty. now against this one document is posted in bkgrnd for 8 and one is for 2 for block stock.
same thing i was told you now as already qty is in blocked stock and reason of blocking those 2 qty already captured in one document w.r.t original inspection lot. then with reference to this original lot what is the need of another lot.
If you want procedure then it is like that:
Original lot of 10 qty.
RR done , defect found
Create bkgrnd notification of f3 type w.r.t inspection lot. for 2 qty.
Post 8 Qty in UNRES
Post 2 Qty in BLCK
Now, process Notification which was created for those 2 defected qty.
Once rectification done and data feed in notification about causes and all.
Apply action box--> Transfer post from block to Unres--> FM QMLR_BLOCKED_TO_FREE_STOCK---> assign to this as Task in notification.
Close the task and qty posted to unres.
without closing task notification not closed and without notification original inspection lot not allows for UD.
I dnt think so any new inspection lot is required w.r.t original one.
If you need separate then definitely you need go to via MB1B posting.
Regards